• 20 Posts
  • 95 Comments
Joined 1 year ago
cake
Cake day: June 16th, 2023

help-circle



  • New comment from /u/santacfan on Reddit:

    Starbase live-

    8:10am- Small crane was up behind the tower around 3am. Couldn’t see what it was lifting on SBL or Rover 2.

    11:20am- No work around the OLM. Concrete is being poured behind the tower.

    3:15pm- Nothing

    4:15pm- Maybe all of the the workers are over at the fishing tournament at the beach

    8:20pm- Lights are on and movement can be seen on the dance floor

    9:50pm- Mosquito spraying truck

    11:00pm- No lifts have been up all day. Work continues on the dance floor

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    7:20am- LR11000 finished moving over next to the OLT overnight and their was the ever present lift at the top of the staircase

    10:45am- Workers have been on top of the OLM. AWP went up to the chopsticks.

    3:00pm- Quiet around the OLM

    6:40pm- People have been moving around the base of the OLM and the deluge tank farm. No visible work though

    9:40pm- Still no lift action but workers could be seen going up the stairs and the lights on the dance floor are on for the first time in several nights.

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase Live-

    6:25am- Workers returning to the pad

    7:26:54am- SQD retracts

    7:47am- SQD work platform is extended

    7:49am- Worker on the SQD arm climbs up to S25’s QD. Installing covers?

    7:58am- Work platform is retracted

    8:41am- SQD arm swings to the side

    8:54:55am- S25 is lifted off of B9

    8:56:40am- Swinging to the side

    9:04:40am- Going down

    9:21:26am- Starts swinging over the stand

    9:23:44am- Lowering onto the stand

    9:45am- Looks like it’s down

    10:32am- Workers back at the pad

    11:04am- AWP going up to S26

    11:12am- Squid is being disconnected from S26

    11:34am- Lift up behind the cryo leg

    11:54am- LR11000 swings away from S26

    12:40pm- Workers on top of the OLM

    1:55pm- AWP goes up to the Hot stage ring. Lifts up to the top of the OLM and behind the cryo leg

    2:15pm- LR11000 starts moving towards the OLM for HSR removal most likely

    3:30pm- Klaxon, storm warning announcement. Lifts go down

    6:34pm- Some workers return to the pad after one heck of a storm. Over on the NSF discord, they said their weather station showed 48mph winds

    9:58pm- Workers have been on top of the OLM and the AWP has been back up at the HSR.

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    3:13am- Before leaving the pad, lifts were up to the top of the OLM and to the back right chine of B9

    5:50am- Pad has been cleared of equipment overnight and It looks like they may be removing the tarp covering the deluge plate right now

    7:30am- OLM area looks clear. No sign of pressure washers yet

    7:51:22am- Cyber truck drives in front of the OLM. (Please tell me they didn’t clear this all out for a photo op)

    7:56:40am- Drone and Cyber truck

    8:04:55am-Now 2 people on bikes are riding around the OLM (Tesla bikes?)

    8:10:49am- Cyber truck leaves the launch site

    10:11am- Looks like a manifold for a set of the methane sub coolers being delivered

    12:40pm- Lift was up at the bottom of S26. Still no sign of anyone pressure washing at the OLM. So between that and the tarp going back on, a test is looking doubtful. (It’s normally 5 to 7 hours from the start of pressure washing to a deluge test.)

    1:33pm- New manifold delivered for the Lox side sub coolers .

    2:33pm- Vent hoses are in both of S28’s tanks. Doesn’t look like it’s going anywhere tonight.

    3:15pm- A crane is up over by the orbital tank farm but the tanks are blocking the view of what it’s doing. (Not by the sub coolers)

    4:12:33pm- Cyber truck now pulling an Rvac is back at the OLM with a photo car in front

    4:17:41pm- Round and round it goes. (The tarp was removed again for the video)

    4:34:14pm- Here they come again

    4:40:22pm- Taking the chains down that keep equipment off the deluge plate. They were apparently ruining the shot.

    4:47:24- Left the OLM and now coming back in. Do one lap and leave the pad area again.

    5:05pm- Back to do some still photos

    5:37:45pm- S29 nosecone venting

    5:56pm- I mean, who doesn’t want to drive circles around the OLM?

    6:34pm- Venting from bottom of S29

    6:39pm- And the road closure is for……taking video of Cyber truck pulling the Rvac up and down the road with no one else around

    7:12pm- Drone following the truck down Hwy 4 this pass

    7:45pm- B13’s transfer tube is lifted for install in the mega bay

    8:35pm- Headlights can be seen to the side of the pad but no workers have returned yet

    8:58pm- S25’s stand is moved to beside the OLM. Here comes another de stack

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    8:50am- Lift up to the top of the staircase. No lights were seen on the dance floor overnight. So work must have been focused inside of the OLM ring.

    9:21am- S31 is being stacked on to its aft section.

    11:46am- All is quiet at the OLM

    2:40pm- Roof beams are going up to the new mega bay and star factory. A cyber truck has been spotted driving around on Rover 1. No lifts up at the launch site

    2:54:40pm- B9 Grid fin tests

    3:43:56pm- S25’s flaps are tested

    4:35pm- Venting at Massey’s

    7:40pm- No lifts. No lights on the dance floor.

    10:30pm- Lift up at the top of the stairs and the dance floor lights are back on. They’ve fixed the tarp around the outside of the dance floor though so you can’t see anyone moving.

    Rover 2-

    15:46:20- Cybertruck enters the launch site

    16:28- Leaves the launch site (Never saw it around the OLM on SBL)

    (This gets synced)



  • New comment from /u/santacfan on Reddit:

    Starbase live-

    9:00am- Lifts were up at the staircase and behind the cryo leg (Maybe at the old staircase) overnight. Workers were busy on the dance floor. Didn’t notice anything happening at the ground level.

    12:25pm- Lifts are down. No signs of anything going on at S26. Another big beam went up at the star factory. It’s really going to block the view of the high bay when it’s done.

    3:10pm- Lift up by the old staircase.

    5:55pm- Maybe 2nd shift will be more exciting

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    8:30am- Nothing happened overnight. 2 lifts went up to the staircase about an hour ago but are back down now.

    11:20am- The 2 lifts have been back up to the top of the staircase

    3:00pm- Just 1 lift at the staircase now. (I know, absolutely riveting)

    5:58pm- Lift goes up behind the cryo leg. Stays for 8 minutes before going down.

    6:31pm- Forklift brings in a flat piece of metal with some cut outs.

    6:38pm- Looks like the forklift puts the piece of metal into the basket of the lift

    6:45pm- Lift goes up to the top of the staircase

    7:09pm- Lift goes back down. Worker seemed to be struggling to get it out of the basket but the lighting was terrible so I can’t tell if they were successful or not

    7:20pm- Forklift brings another piece of metal in, puts it in lift, and lift goes back up to the top of the stairs

    7:40pm- Small shower of sparks from inside of the OLM ring, left side of stairs

    9:20pm- Lift up at the stairs and workers can be seen on the dance floor. Light tower is also on for the first time in awhile. So maybe they are planning on doing work under or around the OLM tonight?

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    8:30am- A lift was up to S29’s methane hatch at Massey’s overnight. A lift was also up to the top of the OLM most of the night and then to show off, 2 lifts went up to the top of the staircase at the same time this morning.

    10:27am- Lifts up to the top of the staircase, the dance floor, and S28.

    2:00pm- Lifts went down for lunch and now they’re back at the same places

    7:30pm- Lift was up to the top of the Cryo leg and of course the staircase.

    10:30pm- 2nd shift either has the night off or has started their night working somewhere other than the OLM.

    (This gets synced)


  • LettuceTurnipTheBeet@lemm.eetoSpaceX@sh.itjust.worksStarship Development Thread #49
    link
    fedilink
    English
    arrow-up
    3
    arrow-down
    1
    ·
    edit-2
    1 year ago

    New comment from /u/santacfan on Reddit:

    Starbase Live-

    12:02am- 24.2 Turns onto Hwy 4

    1:54am- Turns off Hwy 4 into Massey’s

    5:35am- 3 Lifts were up at S28. At the OLM lifts went up to the top and to the staircase overnight.

    8:28am- 3 scissor lifts up under S26

    11:45am- More roof beams are going up at the Star factory. The ever present lift at the top of the staircase has gone up and down a couple of times

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    8:50am- AWP went up to several places around the HSR on B9 overnight. A lift went up and down to the staircase and workers could be seen on the dance floor.

    12:15pm- Lifts have been up to the staircase, dance floor, under the backside of the OLM, and to the lox tank of S26. Overall, back to being pretty boring to watch.

    5:45pm- Workers on top of the OLM

    9:00pm- Lifts have been up to the backside of the OLM and the backside of the tower.

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase Live-

    11:56pm- S27 aft end test tank rolled out to Massey’s

    12:11am- SQD retracts (Rover2)

    1:20am- S29 frost free

    1:43am- S27 test tank arrives at Massey’s

    1:54am- Grinding on the left chopstick

    6:42am- More sparks under the OLM ring to the right of the staircase

    6:59am- Sparks to the left of the staircase

    7:57am- S25 venting. Looks like the stabilizer pins are engaged

    8:20- Lifts were up to both chopsticks, the staircase, the top of the OLM, and to S28 overnight.

    10:21am- Chopsticks start lifting S25

    10:35am- S27 test tank lifted into the structural test stand at Massey’s.

    10:40am- Chopsticks stop

    10:41am- SQD swings back over

    10:46am- Start swinging over B9

    10:53am- Over B9

    10:54am- Start lowering

    11:27am- Down on top of B9

    1:09pm- SQD work platform extended

    1:34pm- Worker up on SQD. Looks like they are removing covers on S25’s QD

    1:40pm- SQD work platform retracted

    1:45pm- Lift has been up at S26 off and on this morning

    1:54:55pm- SQD extends

    2:17pm- SPMT’s headed to Massey’s. S29 coming back already?

    5:00pm- Lift has been up and down to the top of the staircase. The elevator in the tower has been getting a work out today as well going up and down to the SQD level.

    5:15pm- Venting at Massey’s. S29 is go for round 2

    5:24am- S26’s Lox tank is open with a vent hose run to it

    6:16pm- Frost on S29

    7:50pm- S29’s lox tank is mostly frosty. Just a small line at the bottom of the methane tank. Lift up to the back side of the OLM and of course, there is one at the top of the staircase

    8:19:39pm- S29 depress vent. Never got full frosty

    9:48pm- Lift up at S26’s lox tank, back side of the OLM, and to the staircase. More grinding going on inside of the OLM ring to the left of the staircase

    10:17pm- S25’s stand is being moved back to the production site/storage area

    (This gets synced)



  • New comment from /u/santacfan on Reddit:

    Starbase Live-

    10:17pm- S29 exits the high bay

    10:25pm- Stops at the gate to Hwy 4

    10:32pm- Turns onto Hwy 4.

    12:47am- Turns into Massey’s

    8:30am- Lifts were up to the top of the OLM, under the OLM, and to the bottom of S26 overnight. Workers could be seen on the dance floor along with some welding going on.

    10:25am- 1 lift up under the OLM. Right side of staircase looking at the pipe work

    1:30pm- 3 lifts up under the OLM. 2 over by the cryo leg and 1 in the same spot as earlier

    4:00pm- 1 lift up behind the cryo leg

    7:53pm- Workers are on top of B9. Otherwise it’s been a pretty quiet afternoon

    8:49pm- E dome test tank turns on to Hwy 4 headed to Massey’s

    9:27pm- Turns into Massey’s

    9:50pm- One lift was up to the top of the staircase and workers could be seen moving around on the dance floor.

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    11:12pm- Thrust stand turns into Massey’s

    3:15am- S29 moved to the middle of the high bay

    4:25am- New ship lifting jig raised up to S29

    4:28am- Lifts go up to attach the new lifting jig

    5:29am- Lift goes down. Jig is attached

    8:25am- Several workers arrive at the deluge tank farm and climb up to the pressure pipe on top of the large tanks. 2 lifts up at the OLM and 1 up at S26

    8:54am- LR11000 picks up a ring lifting jig

    9:15am- Swings it over to B9 and worker on top starts connecting it to the hot staging ring

    9:20am- S29 has been lifted in the high bay with the new jig

    9:42am- Ship thrust simulator is being moved into the high bay. Looks like S29 may be headed to Massey’s during tonight’s closure

    10:22am- AWP going up to the hot staging ring

    10:25am- Hot staging ring lifted off of B9

    10:27:30am- Swings over to right side of OLM and starts lowering

    10:38am- Looks like it’s down

    11:01am- Hot staging ring disconnected from the crane

    11:11am- Lifting jig disconnected from crane

    1:25pm- One lift has been up under the OLM and one under the OLM.

    4:35pm- Workers have been on top of B9 but it’s been a pretty quiet afternoon otherwise

    6:27:56pm- 26.1 goes pop at Massey’s

    7:20pm- One lift has been up under the OLM

    9:35pm- Welding can be seen on the dance floor and a lift is up to the staircase platform

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    12:22am- B10 turns into the production site

    12:29am- Turns into the mega bay

    7:45am- An AWP went up to B9 in several places overnight. A lift was up at the top of the OLM and one was up welding at the new platform. People could also be seen working on the dance floor. Lifts were up at B10 inside of the mega bay getting it hooked to the bridge crane.

    10:00am- 2 lifts up at the OLM

    10:22am- Lift goes up to the top S26 to disconnect the squid

    11:20am- Squid disconnected and crane swings away from S26

    1:12pm- B10 starts being lifted off of the thrust simulator stand

    1:55pm- Bridge crane moves B10 to the back left corner of the mega bay

    2:00pm- One lift up at the new platform

    2:18pm- LR11000 starts rolling from the suborbital pad to the OLT.

    3:26pm- Arrives at the tower. Adding more stairs to the tower or moved in preparation of a S26 static fire?

    4:02pm- In a weird move, the LR11000 lowered its hook to the top of B9 several times before swinging away. Testing to see if it could remove the hot staging ring if need be?

    8:20pm- No lifts up but workers can be seen on the dance floor. Some of the tarps along the edge are coming down

    9:16pm- New ship lifting jig is picked up in the high bay by the bridge crane

    10:20pm- Booster thrust simulator stand turns onto Hwy 4 to head back to Massey’s

    (This gets synced)



  • New comment from /u/santacfan on Reddit:

    Starbase Live-

    7:45am- More of the same overnight. Scissor lift was up most of the night as well as the lift working on the new platform. The road closure wasn’t used and no lifts went up to S26.

    10:45am- 2 lifts have been up at the OLM. One at the staircase and one at one of the cameras. More scaffolding is coming off of the mega bay.

    2:00pm- Same 2 lifts have been up

    4:50pm- The 2 lifts have went down. Some workers have been walking around the base of the OLM.

    7:25pm- Scissor lift is up to the left of the staircase. Regular lift is up at the new platform. There is a lift up by S26 but just hanging out in the air not actually at the ship. A crane has risen over by where the new booster static fire station is being built by the sub orbital pads but nothing has been lifted yet. Workers were seen walking around the top of the OLM

    7:45pm- Cameron county has tweeted out about the road closure tonight. So hopefully B10 will actually move.

    8:56pm- B10 starts rolling

    9:31pm- Stops at the turn on to Hwy 4

    10:09pm- Turns on to Hwy 4

    (This gets synced)




  • New comment from /u/santacfan on Reddit:

    Starbase live-

    11:13pm- B10 is frost free

    7:50am- Work on S26 has resumed with a single lift up at the methane tank hatch. A lift was also up at the top of the staircase on the OLM for awhile overnight

    8:43am- Crane extends and swings towards OLM

    9:07am- Tool van is back

    9:24am- Crane lifts a piece of metal railing and a small platform up to the back right side of the staircase where the access door is. 2 lifts up working with it (Something to do with getting on and off the dance floor at that location?)

    10:45am- Scissor lift is up at the OLM along with the crane and the 2 lifts working on the railing. 2 lifts up at S26 and 1 lift up at the backside of the OLT.

    12:00pm- The platform has been tack welded into place and lifts go down

    1:36pm- Lifts go back up and disconnect crane from the platform

    2:13pm- Small set of stairs is lifted up to the new platform. Will go from platform to dance floor

    3:10pm- Work continues on the platform and 2 lifts have been up at S26

    3:52pm- Crane lifts another set of steps with a handrail up to the platform

    4:05pm- Crane lowers and leaves the OLM area

    5:10pm- Scissor lift has been up to the left of the staircase. 1 lift was up on the backside of the OLM as well as the 2 lifts working on the platform. 2 lifts are up working on S26.

    7:50pm- Scissor lift is still up as well as one lift at the new platform. Another lift is up on the backside of the OLM

    10:00pm- Lots of grinding and welding on the new platform.

    (This gets synced)


  • New comment from /u/santacfan on Reddit:

    Starbase live-

    7:00am- Storms rolled through late last night and that kept the cranes and lifts grounded.

    9:10am- Heavy rain

    11:35am- The skies are brightening and a lift is up at the dance floor

    12:02pm- Frost on B10’s lox tank

    1:55pm- B10’s lox tank is fully frosted

    3:00pm- Frost starts decreasing

    3:15pm- Depress vent (Lasted 13 minutes)

    4:45pm- Frost is still almost all the way to the top

    6:55pm- Still about halfway covered in frost

    7:00pm- Thin ring of frost on the methane tank. 2 lifts up at the OLM

    8:50pm- The thin ring of frost remains on the methane tank. Lox tank still has patchy frost and depress vents are still occurring. 1 lift up at the OLM.

    9:50pm- Methane tank is frost free. Still a little bit on the lox tank. One lift up at the right side of the OLT.

    (This gets synced)